Put in the Coir Matting while in the trench. Location at least twelve inches with the roll above the trench (further up the slope). Place Each and every staple about a foot apart inside the trench Geotextiles are generally applied underneath rip rap, retaining partitions, as well as other Bank https://fernandogywme.tribunablog.com/the-basic-principles-of-coir-matting-53144095