The second round reveals what “blocks” the team sees as unwanted because they conceive of a means to deconstruct their construction without destroying it. Give Every single team member a bit of paper. Instruct them to write down, at the top in the sheet, a problem they may have at https://team-building79901.blogvivi.com/38582551/not-known-facts-about-corporate-ski-events